The general goal is to repair and enhance historic features of the site as outlined in the CoSA 2017 Bond Project.
These site features include the Brackenridge Lily Pond, Upper Labor Dam, Upper Labor Acequia, Pump House, and Lambert Beach.
The directive for the areas are: preserve and rehabilitate the Lambert Beach river walls acequia walls and upper labor dam; preserve the lily pond walls and water gates; and rehabilitate and restore the pump house structure.